Person
Fernanda Bataglin
Alternate Name:
Fernanda S. Bataglin
Journal article
Model for planning and controlling the delivery and assembly of engineer-to-order prefabricated building systems: exploring synergies between Lean and BIM
This research proposes a model for planning and controlling the delivery and assembly of engineer-to-order prefabricated building systems, emphasizing the integration between site installation and logistics operations. The main theoretical contribution is a set of approaches to implement the “pull production” and “reduce variability” principles...
Conference paper
Guidelines to develop a BIM model focused on construction planning and control
Information pulled from 4D simulations may be used to compare construction scenarios as well as to support decision-making in production planning and control. Different projects, software, tools and planning methods result in a diversity of inputs that should be considered while trying to fulfil 4D...
Conference paper
Application of BIM for supporting decision-making related to logistics in prefabricated building systems
Managing industrialised construction requires an accurate synchronisation of design, manufacturing and assembly processes. Considering the high uncertainty and the interdependences between different processes on site, it is important to consider the status of the construction site in the planning and control process. Understanding the demands...