Sorry, you need to enable JavaScript to visit this website.

Murray-Darling Basin

Subject Hierarchy
Broader terms
Waterway systems
Current term
Murray-Darling Basin
Permalinks
APO URI

ADVERTISEMENT

Report

Management of the Murray-Darling Basin - second interim report: the Basin Plan


The purpose of this interim report is to detail the concerns that the Senate Standing Committee on Rural and Regional Affairs and Transport has with the Murray-Darling Basin Authority's Proposed Basin Plan (the Basin Plan).
Strategy

Proposed Basin Plan: August 2012


On 28th May 2012, the Authority provided a package of documents to each member of the Murray–Darling Basin Ministerial Council which included a transmittal letter, the Proposed Basin Plan – a revised draft, the Proposed Basin Plan consultation report, the Socio-economic implications of the Proposed Basin Plan and a Guideline for the method to determine...
Strategy

Proposed Basin plan – a revised draft


The Murray-Darling Basin Authority has released the revised Basin Plan to ministers as part of the next step in the process of developing a plan for the Murray–Darling Basin. The MDBA also released a report detailing the changes that have been made to the draft based on submissions received during the consultation period.
Technical report

An analysis of MDBA modelling outputs for the draft basin plan: Hydrodynamic modelling of the Coorong and Murray mouth


This document has been written to allow the draft Basin Plan to be assessed as to whether it will protect the essential attributes of this internationally important wetlands.
Guide

Guide to the proposed Basin Plan: Technical background


This volume reflects the content of the overview and the regional guides, but at a more detailed level, with more of the technical background identified and explained. The Murray–Darling Basin Authority (MDBA) was established by the Water Act 2007 (Cwlth) and charged with preparing a plan — the Basin Plan — which will provide a...