Organisation
CRC for Water Sensitive Cities
Case study
Gladstone East Shores precinct
Delivery of sustainable irrigation using harvested stormwater and wicking bed technology to achieve green and resilient turf open space within the new Gladstone East Shores Precinct. The Gladstone East Shores Precinct is a major new recreational hub for the City of Gladstone located on the foreshore of Auckland Inlet. The integrated parkland design features an...
Case study
Currumbin ecovillage rainwater harvesting
Urban household water supplied by rainwater. The Currumbin Ecovillage is a 147 lot development over 270 acres of land in the Gold Coast Hinterland. The development contains community title blocks which range from 400 to 1400m2 . All of the water supplied to the houses in the development is from a combination of large (>20kL)...
Case study
Elizabeth Street catchment integrated water cycle management plan
Strategically implementing storage and permeable surfaces to mitigate flood risks. The Elizabeth Street Catchment Integrated Water Cycle Management (IWCM) Plan aims to mitigate the extreme flood risks present in the 308-hectare Elizabeth Street Catchment. The plan includes a suite of targets, projects and initiatives to be implemented over a five-year period. These actions will enable...
Case study
Expansion of stormwater quality requirements in the City of Moonee Valley Local Planning Scheme
Local planning policy can advance requirements for local development.
Case study
Currumbin ecovillage wastewater management: case study
Decentralised residential wastewater management. The Currumbin Ecovillage is a 147 lot development over 270 acres of land in the Gold Coast Hinterland. The development contains community title blocks which range from 400 to 1400m2. A sewerage treatment plant located within the development accepts and treats all wastewater which is then provided back to the houses...