Report
Review of the water sharing plan for the Barwon-Darling unregulated and alluvial water sources 2012: final report
This report finds that there is clear evidence to indicate that the current water sharing plan rules are resulting in more frequent and longer 'cease to flow' periods. The current cease to flow period of over 11 months Barwon-Darling system is the longest in recorded...
Technical report
Technical review of the water sharing plan for the Barwon-Darling Unregulated and Alluvial Water Sources 2012
This technical report prepared by Prof. Fran Sheldon from Australian Rivers Institute (Griffith University) reviews the ecology, hydrology, and license types of water along the Barwon-Darling.
Draft report
Draft water sharing plan review: Barwon-Darling unregulated and alluvial water sources 2012
This draft report presents the findings and recommendations from New South Wales' Natural Resources Commission’s statutory review of the Water Sharing Plan for the Barwon-Darling Unregulated and Alluvial Water Sources 2012.