Last planner
Conference paper
Digital Kanban boards used in design and 3D coordination
The hypothesis of this research is that the Last Planner System (LPS) in combination with the Kanban Method is better suited than conventional project production planning and controls to manage the design phase. In the Toyota Production System (TPS) the Kanban (sign board) is attached to the material or product and is pulled through the...
Conference paper
Shared understanding: The machine code of the social in a socio-technical system
The emergence of the explicit need for shared understanding as an underpinning flow in lean construction has generated some debate and exposed a need to provide a better explanation. Following an investigation comprising of a total of 27 interviews and several workshops, the data identifies and connects the relationship between inappropriate understanding and constraints to...
Conference paper
Phase Schedule implementation and the impact for subcontractors
The hiring of subcontractors for construction is widely adopted in the construction industry, so a good relationship between the subcontractors and contractors is essential for the success of the project. However, there is still a need to analyze how the subcontractors can improve their performance based on a collaborative planning process and their relationship with...
Conference paper
Real-time tracking of production control: Requirements and solutions
Production control in construction has been mainly discussed within the scope of Lean Construction, through tools and methods such as Last Planner System (LPS), Location-Based Management System (LBMS), and Takt Time Planning (TTP). However, despite the increasing use of these systems, information about the use of equipment, labour, and materials is still gathered through manual...
Conference paper
Introducing new capacity planning metrics in production planning
The need for proper and reliable planning is essential for project success. Capacity planning has received good attention in the construction community but few metrics exist to assess its performance. Since it is impossible to improve what cannot be measured, the goal of this paper is to introduce new capacity planning metrics that will help...