Sorry, you need to enable JavaScript to visit this website.
Report
ShareSHARE

South Australia separation event 1 December 2016: preliminary report

Publisher
Power resources Electricity distribution networks South Australia
Resources
Attachment Size
download linkapo-nid71832.pdf 562.02 KB
Description

AEMO has released its preliminary report into the South Australian separation event on 1 December 2016. The report states that at 0016 hrs (AEST) on 1 December 2016, a fault on the Moorabool to Tarrone 500kV transmission line in Victoria resulted in the South Australia (SA) electricity network being disconnected from Victoria.

Publication Details
Access Rights Type:
open