Workflow
Journal article
Integrated BIM-based LCA for the entire building process using an existing structure for cost estimation in the Swiss context
The main objective of this study is to develop an integrated BIM-LCA method for the entire building process by relating it to an established workflow.
Conference paper
Measuring project's team culture in projects using the last planner system
The construction industry is known for bad project performance and a culture characterized by adversarial behaviours. The Last Planner System (LPS) is designed to improve these circumstances through the enhancement of workflow reliability by involving various disciplines in joint planning processes and a culture of collaboration. This paper aims to measure the project team culture...