Conference paper
Description
Modern Information and Communication Technology (ICT) make it possible to re-organize the information flow and enhance the physical flow of the Construction Supply Chain (CSC). Considering the resource status and potential risks that exist in the CSC, this paper first explores the current CSC re-organization caused by the application of Building Information Modelling (BIM) and related beneficial conditions created by ICT. It then tackles the problem of controlling risk effectively by off-site guarding the upstream of the CSC. Based on the selected approach, the concept and basic mode of a look-ahead supply schedule is proposed. Finally, results to a use case demonstrate the applicability of a look-ahead supply schedule for a resource loaded construction project.
Editor's note

This paper can be freely distributed as long as it is kept in its original form

Publication Details
DOI:

10.24928/2017/0172

Pagination:
877-884
Publication Year:
2017