2020 Integrated System Plan for the National Electricity Market


The Australian Energy Market Operator’s (AEMO) Integrated System Plan (ISP) provides a 20-year roadmap for the National Electricity Market (NEM) through the energy transition period to 2040.
Report

Renewable Integration Study: stage 1 report


The Renewable Integration Study (RIS) is the first stage of a multi-year plan to maintain system security in a future National Electricity Market (NEM) with a high share of renewable resources. AEMO’s findings and recommendations in this report reflect both its day-to-day experience operating the NEM power system, and the results of extensive RIS modelling...
Report

Summer 2019-20 readiness plan


The Australian Energy Market Operator (AEMO) has prepared this document to provide information about its preparations for summer 2019-20. These preparations are designed to minimise the risk of customer supply disruption in the National Electricity Market during the periods of highest demand for electricity from the grid. This report is based on information available at...
Report

Maintaining power system security with high penetrations of wind and solar generation


The purpose of this insights paper is to set the scene for AEMO’s ongoing investigations into renewable integration in Australia and identify any additional priority focus areas. This insights paper is generally based on information available to AEMO as at 1 October 2019 unless otherwise indicated.
Report

2019 Electricity statement of opportunities


The 2019 report forecasts a continued elevated risk of expected unserved energy over the next ten years. Compared to last year’s forecast, and based on improved model representation of input uncertainties, AEMO observes greater risks of load shedding due to uncontrollable, but increasingly likely, high impact events such as coincident unplanned outages.