Sorry, you need to enable JavaScript to visit this website.

Last planner

Subject Hierarchy
Broader terms
Project planning
Current term
Last planner
Permalinks
APO URI

ADVERTISEMENT

Conference paper

Lean construction practice: culture, standardization and informatization - a case from China


China, with its big construction industry, has promoted lean concepts in recent years, but there are still obstacles in practice. This study shows that three important aspects lead to the success of lean construction implementation. Relationships among culture, standardization and informatization are explored.
Conference paper

The beauty of a phase-overlapping Last Planner System with incorporated Takt


This research concludes that the Last Planner System (LPS) aligns to the Toyota Production System (TPS) and its recognized management theory, which is a vehicle to integrate the minds + hands philosophy within projects from early design phase till handover. Our findings show that adopting the LPS as a production system helps to align and...
Conference paper

Measuring project's team culture in projects using the last planner system


The construction industry is known for bad project performance and a culture characterized by adversarial behaviours. The Last Planner System (LPS) is designed to improve these circumstances through the enhancement of workflow reliability by involving various disciplines in joint planning processes and a culture of collaboration. This paper aims to measure the project team culture...
Conference paper

Integrated lean and BIM processes for modularised construction


This paper provides an insight into an integrated lean and BIM implementation project supporting a highly modular and offsite production process on a data centre project. The case study highlights how lean and BIM can help the team to visualise the production plans, control the production in the field, report accurate production status and support...
Journal article

Applying level of detail in a BIM-based project: an overall process for lean design management

Few construction companies apply the available lean tools and processes in an integrated manner when managing design. Additionally, lean design management tools and processes each have their own strengths and optimal phases in which they should be applied, so by combining information from various sources, this paper defines a location-based design management process using the...