Person

Claus Nesensohn

Conference paper

The beauty of a phase-overlapping Last Planner System with incorporated Takt

This research concludes that the Last Planner System (LPS) aligns to the Toyota Production System (TPS) and its recognized management theory, which is a vehicle to integrate the minds + hands philosophy within projects from early design phase till handover. Our findings show that adopting...
Conference paper

Combined application of earned value management and last planner system in construction projects

The application of the Last Planner System (LPS)in the construction industry is increasing more and more. Reviews in the literature report that by applying LPS project performance is improving. However practical experience shows that there is some lack of structure in daily work. Further more...
Conference paper

A lean construction maturity model for organizations

At IGLC 2014 a Lean Construction Maturity Model (LCMM) was introduced and at IGLC 2015 its validation was presented. The LCMM offers organizations in the AEC Industry to obtain a systemic and holistic overview of their current state of LC maturity and provides them with...