Sorry, you need to enable JavaScript to visit this website.

Electricity grid

Alternative labels
Electricity transmission
Subject Hierarchy
Current term
Electricity grid
Narrower terms
Permalinks
APO URI

ADVERTISEMENT

Strategy

Whole of System plan


This strategy document provides an informed view on what Western Australia’s principal electricity system, the South West Interconnected System, might look like over the coming decades. The Whole of System plan is a detailed study of how the state's major power system may evolve over the next 20 years.
Discussion paper

Post 2020 market design consultation paper


A plan for how Australia transforms how we generate, transmit, distribute and use energy is needed. This consultation paper, covering seven market design initiatives, has been released to gather input on a coherent national electricity market design.
Report

National Energy Emissions Audit: July 2020


This report outlines how Victoria and South Australia are leading Australia’s transition to renewables, with renewable energy capacity at 33%, almost twice that of Queensland and New South Wales at 16% capacity. However, research shows the northern states are ramping up new renewables.
Strategy

2020 Integrated System Plan for the National Electricity Market


The Australian Energy Market Operator’s (AEMO) Integrated System Plan (ISP) provides a 20-year roadmap for the National Electricity Market (NEM) through the energy transition period to 2040.
Report

State of the energy market 2020


This report provides an accessible review of the transmission and distribution networks and energy retail markets in eastern and southern Australia over 2019 and the early months of 2020.