Electricity distribution networks
Guide
AER electricity NSP Registration Exemption Guideline: Version 6 - 1 March 2018
The Network Exemption Guideline relates to a privately-owned embedded or exempt network. An exempt network is any network supplying electrical energy to a third party, but not a transmission or distribution network registered with AEMO.
Report
Powering our future: Inquiry into modernising Australia's electricity grid
This inquiry heard that a lack of policy certainty is impacting on the operation of the NEM, as a lack of certainty has an impact on investment. The policy certainty required relates to a mechanism to achieve emissions reduction in the electricity sector. The electricity sector is capital intensive and a lack of policy certainty...
Report
Reliability frameworks review: interim report
This review is looking at ways to deliver a reliable power system – one that has enough electricity available when consumers need it – at the lowest cost.
Report
Summer operations 2017-18
AEMO has released its 2017/18 summer readiness report, which outlines all actions taken to best prepare the National Electricity Market to meet Australian energy consumer requirements.
Report
Managing flexibility whilst decarbonising electricity: the Australian NEM is changing
The pathway to gradual decarbonisation of the NEM raises a number of questions and concerns. This study has modelled scenarios that deliver an operable grid, able to keep the lights on, rather than simply stacking capacity to meet demand.