Conference paper
Application of BIM design manuals: a case study
A problem often encountered by contractors is that the information provided is not always equal to the information needed in the Building Information Model (BIM). This applied research showed that design manuals should reflect new project delivery methods to support lean principles for all parties involved in the project.
Conference paper
Digitizing lean construction with building information modeling
This paper reports on the implementation of a digital Lean Construction Management (LCM) approach to construction projects. The use of QR codes, Kanban cards and daily meetings demonstrates a new platform to add value to the BIM model and to construction site collaboration.
Conference paper
The beauty of a phase-overlapping Last Planner System with incorporated Takt
This research concludes that the Last Planner System (LPS) aligns to the Toyota Production System (TPS) and its recognized management theory, which is a vehicle to integrate the minds + hands philosophy within projects from early design phase till handover. Our findings show that adopting the LPS as a production system helps to align and...
Conference paper
Measuring project's team culture in projects using the last planner system
The construction industry is known for bad project performance and a culture characterized by adversarial behaviours. The Last Planner System (LPS) is designed to improve these circumstances through the enhancement of workflow reliability by involving various disciplines in joint planning processes and a culture of collaboration. This paper aims to measure the project team culture...
Conference paper
Lean design process for formwork engineering
Formwork engineering is one of the major cost factors in reinforced concrete construction, which is not only critical for the successful completion of construction projects, but also critical for profitability. The purpose of this research is to utilize lean thinking in formwork design so as to enhance design correctness and eliminate waste.