Conference paper

Sustainability performance evaluation in building projects by integrating Lean and sustainable management using the Delphi method


This research paper aims to contribute to the improvement of sustainable management of Peruvian buildings throughout the project lifecycle by integrating the Lean Construction philosophy and sustainability concepts through the Delphi method.
Journal article

BIM-LEAN as a methodology to save execution costs in building construction - an experience under the Spanish framework

The most representative trends in the construction industry that enable improvements are both Building Information Modelling paradigm (BIM) and Lean Construction philosophy. However, there is a scarcity of works on the synergy of both paradigms. Therefore, this paper is focused on the benefits of both disciplines and the impacts on project efficiency through a case...
Journal article

The last planner system and building information modeling in construction execution

Many researchers have stated that lean and building information modeling (BIM) have positive synergies. This integrative literature review aims at exploring this body of knowledge within the scope of combinations of BIM and the Last Planner System, as an important Lean construction method, in the phase of construction execution.
Conference paper

The beauty of a phase-overlapping Last Planner System with incorporated Takt


This research concludes that the Last Planner System (LPS) aligns to the Toyota Production System (TPS) and its recognized management theory, which is a vehicle to integrate the minds + hands philosophy within projects from early design phase till handover. Our findings show that adopting the LPS as a production system helps to align and...
Conference paper

Measuring project's team culture in projects using the last planner system


The construction industry is known for bad project performance and a culture characterized by adversarial behaviours. The Last Planner System (LPS) is designed to improve these circumstances through the enhancement of workflow reliability by involving various disciplines in joint planning processes and a culture of collaboration. This paper aims to measure the project team culture...