One of the major OEMs (Original Equipment Manufacture Car Manufacture) in the automotive industry has successfully implemented Takt planning in several of their plant construction projects. This has allowed them to do quicker handovers as well as the possibility to do partial handovers. The efficiency and transparency of this process can even be further improved when the installation of production equipment follows the same method, this enables the OEM to reduce the overall time required for the project delivery. This paper shows the advantages of using Takt Planning in the equipment installation phase. A case-study shows the first experience using Takt Planning and the existing connections to the building construction site. This paper is focused on Takt planning and highlights the potentials of lean equipment installation as well as showing the first results of an implemented real case.
Editors note

This paper can be freely distributed as long as it is kept in its original form

Publication Details
DOI:

10.24928/2017/0091

Pagination:
721-728
Publication Year:
2017