Sorry, you need to enable JavaScript to visit this website.

Waste minimisation

Alternative labels
Waste minimization
Subject Hierarchy
Broader terms
Waste management
Current term
Waste minimisation
Permalinks
APO URI

ADVERTISEMENT

Conference paper

Best value procurement from a contractor point of view


Best Value Procurement (BVP) was introduced in Norway in 2016. BVP has contributed, to a certain extent, to Lean implementation. However, the practice should be improved to increase value and transparency and minimize conflict and waste.
Conference paper

A case study on improving standardization in the conception phase by developing tools and protocols


This paper presents an action research approach to develop and implement a framework to help in creating an improved visual mapping of the information flows between the departments of an architectural firm. The aim is to use the principles of Value Stream Mapping (VSM) from Lean Production and Building Information Modelling (BIM) processes to improve...
Conference paper

Lean design process for formwork engineering


Formwork engineering is one of the major cost factors in reinforced concrete construction, which is not only critical for the successful completion of construction projects, but also critical for profitability. The purpose of this research is to utilize lean thinking in formwork design so as to enhance design correctness and eliminate waste.
Video

Towards zero carbon - the compost project


This video introduces CRCLCL's projects looking at international cases that encouraging compost to minimise waste. Australian households have opportunities to utilise composting as a way to achieve sustainable environmental outcomes.
Conference paper

Site layout planning through BIM visualisation - a case study


The paper here explores minimisation of wastes on construction sites, as defined by Lean Construction, using a BIM model highlighting the construction site layout planning to visualise the various aspects of space constraints, access routes, safety considerations, and a visual approach to progress monitoring and reporting.