Construction industry
Conference paper
Product Modularity, Tolerance Management, and Visual Management: Potential synergies
Product Modularity refers to the hierarchical partitioning of products into their constitutive components. This concept has been explored in manufacturing to ease product design, simplify production, and to efficiently provide variety. Efforts have been made to transfer this knowledge to the construction context (i.e. one-off products, temporary supply chain, production taking place inside the product)...
Conference paper
Language, moods, and improving project performance
Compared to other industries, the construction sector has lagged in improving productivity. Effective performance, of which productivity is an indicator, is facilitated by conversation that clearly identifies necessary steps to achieve common goals. The type of language used in productive conversation can be referred to as the language of action; similarly, the term 'linguistic action'...
Conference paper
Mastering complexity in takt planning and takt control - Using the three level model to increase efficiency and performance in construction projects
When scheduling a construction project, resource consumption, efficiency of the trades, external influences and the possible changes within the construction process must be taken into account. Hence, the complexity of the construction schedule and an exact planning is difficult. So often the time buffers are balancing the unexpected events. That's the reason the full potentials...
Conference paper
The role of slack in standardized work in construction: An exploratory study
While some studies have addressed the key elements of standardized work (SW), the role played by the concept of slack as a fundamental element of operations design is rarely discussed in an explicit way. Considering the context of the construction industry, the aim of this study is to carry out an exploratory investigation of the...
Conference paper
Using technology to achieve lean objectives
The construction industry is facing increased challenges and becoming more and more complex due to number of factors. Whether it is constructing a Building, Infrastructure or Industrial plant, the challenges remain there in every type of the project. This results in delays, waste, overruns and claims. So we need to develop new ways of doing...