Journal article
Description

With an increasing societal need for temporary buildings, while construction industry faces resource and time efficiency challenges, factory assembly of modular buildings can be a solution. This case study at a start-up company uses experiences from assembly system design and eco-design literature to propose green lean design principles to be used in the design and development of building modules and their assembly stations. The eco-design strategy wheel is used as a basis and adapted for the assessment of green and lean building manufacturing.

Publication Details
DOI:

10.1016/j.promfg.2018.06.096

License type:
CC BY-NC-ND
Access Rights Type:
open
Volume:
25
Pagination:
594-601