Sorry, you need to enable JavaScript to visit this website.
Journal article
Description

With an increasing societal need for temporary buildings, while construction industry faces resource and time efficiency challenges, factory assembly of modular buildings can be a solution. This case study at a start-up company uses experiences from assembly system design and eco-design literature to propose green lean design principles to be used in the design and development of building modules and their assembly stations. The eco-design strategy wheel is used as a basis and adapted for the assessment of green and lean building manufacturing.

Publication Details
DOI:
10.1016/j.promfg.2018.06.096
License type:
CC BY-NC-ND
Access Rights Type:
open
Volume:
25
Pagination:
594-601