Sorry, you need to enable JavaScript to visit this website.

Waste minimisation

Alternative labels
Waste minimization
Subject Hierarchy
Broader terms
Waste management
Current term
Waste minimisation
Permalinks
APO URI

ADVERTISEMENT

Conference paper

A requirement model for Lean leadership in construction projects


A recently conducted survey with corporate members of the LCI showed that the main barriers in Lean implementation are managerial based. To achieve the required change, site managers play a very important role as the linkage between the people responsible for value-adding activities on the construction site and the top management.
Conference paper

Optimized installation flow: A strategy for substantial cycle time reduction


Industrial system infrastructure installations, such as those in semiconductor fabrication plants, are complex, short-term and mission-critical. Our strategy, called Optimized Installation Flow (OIF), builds on lean and associated theories in the realm of production planning and control, synthesizing a method with seven principles, and can manage such projects and substantially reduce their durations.
Conference paper

Waste in design management operations from the viewpoint of project needs


Traditional design management processes aim to remove waste on individual design processes, neglecting to view the process as a whole. This research answers the question: How project participants perceive waste in design management operations, and in which ways the waste could be eliminated?
Conference paper

Precast concrete building construction process comparison


This paper deploys value stream mapping (VSM) as a lean methodology to investigate and compare the process differences between a Canadian precast project and a Chinese precast project as a basis for improvements in reducing process waste.