Conference paper
The ER design simulation game: Experience and reflect
Most simulation games that exist are targeted towards experiencing and reflecting on Lean principles such as tact time, pull, Kanban, continuous improvements etc. The design phase in construction is characterised by information not being available, iterative work, specialized work tasks, and high uncertainty. The research aim is to develop and test a design simulation game...
Conference paper
A case study on the success factors of Target Value Design
Target Value Design (TVD) has extensively been adopted in Integrated Project Delivery (IPD) environments in the U.S. Drawn from a profit planning approach used in the manufacturing industry called Target Costing (TC), TVD supports integrated project teams to plan and deliver projects for an agreed target cost. Research on TVD has revealed the success rate...
Conference paper
Shared understanding: The machine code of the social in a socio-technical system
The emergence of the explicit need for shared understanding as an underpinning flow in lean construction has generated some debate and exposed a need to provide a better explanation. Following an investigation comprising of a total of 27 interviews and several workshops, the data identifies and connects the relationship between inappropriate understanding and constraints to...
Conference paper
On epistemology of construction engineering and management
In philosophy of science, there have been two different starting points for epistemology: Platonism and Aristotelianism. These two alternative starting points have played a major role also in the formation of fundamental ideas of engineering and management generally as well as in relation to construction.
Conference paper
A Portfolio/Process/Operations (PPO) analysis of a meta-project production system in renovation projects
The Portfolio/Process/Operations (PPO) model is a novel approach to understanding the elements that impact production systems in the world of construction. Building on prior work such as the "Transformation-Flow-Value" (TFV) theory, the PPO model adds a multi- and meta-project view through its consideration of the total "Portfolio" of projects and partners in which each company...